At this futuristic facility where 3-D printing of medical devices will be conducted, the owner and architect specified a 6" concrete floor with radiant tube heating. For the concrete contractor, utilizing Helix Micro Rebar was an easy choice.
High Quality finish was unaffected inclusion of Helix.
F numbers were easily achievable as the laser screed was not impacted by reinforcing during travel.
No wire mesh or rebar to potentially damage tubing. Also the job was safer without installation labor or tripping hazards to workers.